Project: Building Completion Services


Stage 1
SummaryComponents

On behalf of the Construction, Plumbing and Services IRC, Artibus Innovation is reviewing and updating the following training package components:

  • 5 qualifications:
    • CPC3XX19 Certificate III in Construction Waterproofing
    • CPC3XX19 Certificate III in Roof Tiling
    • CPC3XX19 Certificate III in Solid Plastering
    • CPC3XX19 Certificate III in Wall and Ceiling Lining
    • CPC3XX19 Certificate III in Wall and Floor Tiling
  • 43 units of competency.

The Construction, Plumbing and Services IRC is updating the Building Completion Service qualifications in the CPC training package to align with key drivers for change (ie, new technologies, digitisation, new work practices, environmental regulations and new WHS requirements), current vocational outcomes, and transition to the Standards for Training Packages 2012.

The building completion services sectors involve “finishing” work such as plastering, carpentry, tiling and painting and decorating. Typically, businesses operate in local or specialised niche markets with few businesses operating in more than one state or territory. Across these sectors, licensing requirements vary depending on the type of work.

The qualifications in the scope of this project are meeting the needs of the skill shortage areas including: roof, wall and floor tilers, and solid and fibrous plasterers. The design of qualifications will support articulation and strengthen cross sector pathways to support occupational mobility.

A Technical Advisory Group (TAG) will be established to provide key input on the:

suitability of packaging

inclusion of skill sets

unit relevancy and content.

Nominations for the Technical Advisory Group have closed and are currently being reviewed by the TAG Chair, and IRC member Jocelyn Martin.

Last updated: December 2018
This project has had 295 visitors.

Stage 1
  • project planning
  • stakeholder engagement and consultation
  • establish a technical advisory group (TAG)
Public consultation and feedback
Project Downloads

The following is a list of the training package components being considered in this project:

Qualifications:

  • CPC3XX19 Certificate III in Construction Waterproofing
  • CPC3XX19 Certificate III in Roof Tiling
  • CPC3XX19 Certificate III in Solid Plastering
  • CPC3XX19 Certificate III in Wall and Ceiling Lining
  • CPC3XX19 Certificate III in Wall and Floor Tiling

Units of Competency:

  • CPCCPB3015 Install acoustic and thermal environmental protection systems
  • CPCCRT2001 Handle roof tiling materials
  • CPCCRT2002 Use roof tiling tools and equipment
  • CPCCRT3001 Tile regular roofs
  • CPCCRT3002 Tile irregular roofs
  • CPCCRT3003 Repair and replace valleys, valley irons and flashings
  • CPCCRT3004 Repair and renovate tile roofs
  • CPCCRT3005 Slate a roof
  • CPCCRT3006 Fix shingles to roofs and facades
  • CPCCSP2001 Handle solid plastering materials
  • CPCCSP2002 Use solid plastering tools and equipment
  • CPCCSP2003 Prepare surfaces for plastering
  • CPCCSP3001 Apply float and render to straight and curved surfaces
  • CPCCSP3002 Apply set coats
  • CPCCSP3003 Apply trowelled texture coat finishes
  • CPCCSP3004 Restore and renovate solid plasterwork
  • CPCCSP3005 Install pre-cast decorative mouldings
  • CPCCSP3006 Install cast plaster blockwork
  • CPCCSP3007 Apply plaster by projection machine
  • CPCCSPXXX Carry out conite construction
  • CPCCWC2001 Complete penetrations and flashings
  • CPCCWC3001 Install and finish plasterboard and fibre cement sheeting to curved walls and ceilings
  • CPCCWC3002 Install and finish plasterboard and fibre cement sheeting to arches
  • CPCCWC3003 Install dry wall passive fire-rated systems
  • CPCCWC3004 Install suspended ceilings
  • CPCCWF2001 Handle wall and floor tiling materials
  • CPCCWF2002 Use wall and floor tiling tools and equipment
  • CPCCWF3001 Prepare surfaces for tiling application
  • CPCCWF3002 Fix floor tiles
  • CPCCWF3003 Fix wall tiles
  • CPCCWF3004 Repair wall and floor tiles
  • CPCCWF3005 Carry out decorative tiling
  • CPCCWF3006 Carry out mosaic tiling
  • CPCCWF3007 Tile curved surfaces
  • CPCCWF3008 Tile domestic pools and spas
  • CPCCWP2001 Handle waterproofing materials
  • CPCCWP2002 Use waterproofing tools and equipment
  • CPCCWP2003 Prepare for construction waterproofing process
  • CPCCWP2004 Prepare surfaces for waterproofing application
  • CPCCWP3001 Apply waterproofing process to below ground level wet areas
  • CPCCWP3002 Apply waterproofing process to internal wet areas
  • CPCCWP3003 Apply waterproofing process to external wet areas
  • CPCCWP3004 Apply waterproofing remedial processes

The following is a list of milestones for this project:

Milestones have not been set for this project yet.


The TAG Members page is not currently available.

The research section is not currently available.

The have your say page is not yet available.

Project Contact
Project Manager: Chris Todd